How to test the Installation 1. Apply battery power to the inverter by engaging the fuse, switching the breaker on or switching the battery disconnect switch to the ON position. The Inverter/Charger will remain off. 2. Disconnect all AC loads from the breaker panel by switching the main on/off breaker or all indiā¦